![]() |
![]() |
||||||||
|
| TCP-Racing | Events | Technical | Vehicles | Wallpaper | Letters | |
|
17)
Connect inner tie rods to rack centerlink. |
18)
Reassemble column, insert through firewall then install intermediate shaft
with u-joints. |
19) Check torque specs on all bolts. Install complete. (Coilover Kit is NOT required to install the Rack & Pinion.) |
Rack
& Pinion Kit is available in both Manual and Power versions. |
|
© 2008 Total Control Products - A Chris Alston's Chassisworks, Inc. Brand |
(916) 388-0288 |